logo
citation
produits
produits
Maison > produits > Epoxy Powder Coating > epoxy powder coating 3PP Three-layer structure polyolefin epoxy powder coating
Catagories
Contacts
Contacts: Mr. Sindara Steel
Faxeur: 86-731-89695778
Contact maintenant
Envoyez-nous un courriel.

epoxy powder coating 3PP Three-layer structure polyolefin epoxy powder coating

Détails de produit

Lieu d'origine: CHINE

Nom de marque: Sindara steel

Certification: ISO 9001, ISO 14001, ISO 45001, CE

Numéro de modèle: (Norme ISO 21809-1:2018)

Conditions de paiement et d'expédition

Quantité de commande min: 1 tonne

Prix: 100USD-5000USD

Détails d'emballage: Emballage extérieur en carton, doublé d'un sac en polyéthylène

Délai de livraison: 10-30 jours

Conditions de paiement: L / C, T / T

Capacité d'approvisionnement: 1000000

Obtenez le meilleur prix
Mettre en évidence:

3PP epoxy powder coating

,

Three-layer structure epoxy powder coating

,

Polyolefin epoxy powder coating

epoxy powder coating 3PP Three-layer structure polyolefin epoxy powder coating
Description

 

3LPP (Standard ISO 21809-1:2018)

 

The epoxy powder coating is the implementation of ISO 21809-1:2018 standard, which

is the bottom design of the three-layer structure of polypropylene in buried steel-made pipe, using appropriate epoxy resin, curing agent, pigment, filler, etc., and can form a composite anti-corrosion system with excellent performance with intermediate layer adhesive and outer polypropylene.

 

1. Application scope and characteristics

 

External anti-corrosion of steel pipe and pipe fittings.

Compared with other forms of anti-corrosion, it has the characteristics of good adhesion, strong cathode disbondment, and collision and damage prevention.

It has the characteristics of mature process, wide application range, long anti-corrosion life, and wide operating temperature range (-20℃ ~100℃).

 

2. Method and dosage

 

1 Coating method: Electrostatic spraying.

2 Theoretical dosage: 150g/M2/100μm.

3 Surface treatment: Sandblasting or Pelblasting.

4 Curing instructions: Apply the powder coating on the surface of 200~220℃. When the powder coating forms a gelatinized state, the middle adhesive layer is squeezed and wound, so that the two layers are integrated into one, and then wrap the polypropylene layer, and finally form a complete three-layer coating structure.

 

3.Production Department

 

epoxy powder coating 3PP Three-layer structure polyolefin epoxy powder coating 0 epoxy powder coating 3PP Three-layer structure polyolefin epoxy powder coating 1 epoxy powder coating 3PP Three-layer structure polyolefin epoxy powder coating 2

 

4. Paking

 

epoxy powder coating 3PP Three-layer structure polyolefin epoxy powder coating 3 epoxy powder coating 3PP Three-layer structure polyolefin epoxy powder coating 4 epoxy powder coating 3PP Three-layer structure polyolefin epoxy powder coating 5